About
Client: Burton Contractors Pty Ltd
Contract Period: 22nd November 2015 - 13th April 2016
Details: Shared path bridge for pedestrian and cyclist traffic over the M4 motorway at Werrington. The bridge is a 2-span structure, 64m in total length and consists of a cast in situ substructure and bored pile foundations.